Saturday, April 3, 2021

COLD START-UP PROCESS

COLD START-UP PROCESS

Preparations for Cold Start-up

1.   All the manhole doors should be in close condition.   Tightness of the Nuts and Bolts of the man hole doors to be checked properly.
2.     All the water wall drain lines should be in close condition.
3.     All the steam drain lines should be in open condition.
4.     Start-up vent Root Manual isolation valve  should be in open condition.
5.     Drum level should be at Normal Water Level (NWL).
6.  Continuous Blow Down (CBD)  and  Intermittent Blow Down (IBD) drains should be in close condition.
7.   All the super heater vents including Drum vent and Puppy Header vent should be in open condition.
8.     Before and After Isolation valves at Feed Control Station (FCS) should be in open condition.
9.     Attemperation Control valve before and after isolation valve should be in open condition .
10.   Hydra step should be in healthy condition.
11.   Safety valves should be in healthy condition.
12.   Main Steam stop valve and by- pass valve should be in close condition.
13.   Soot blower manual isolation valve and control valve should be in close condition.
14.Boiler Drum Gauge glass steam side and water side isolation cocks should be in open condition.
15.   HP Dosing Pumps should be in Healthy condition and open suction and discharge valves of the pump.
16.   Solution in HP Dosing agitator tank should be at normal level.
17.   Boiler Feed Pumps should be in healthy condition.
18.Deaerator water level should be maintained at 60% by taking DM Transfer pump in service.
19.   Air compressors should be in healthy condition.
20.   Ash handling systems should be in healthy condition.
21.   ESP should be in healthy condition.
22.   ID fan damper should be in Zero position.
23.   All the interlocks and protection should be checked properly viz. Drum level low, Deaerator level low, Boiler Feed Pump (BFP) discharge pressure low, Flue gas temperature at Post Combustion Chamber (PCC) outlet high, silo level.



Cold Start-up process

1.     After Kiln light-up, when flue gas temperature at PCC outlet increases to more than 450 deg.C, open ID fan damper 5%. Due to natural draught created by chimney, flue gas passes through Boiler and slow heating and expansion takes place.
2.     After opening of ID fan damper, Boiler furnace temperature rises slowly. When the furnace temperature rises to 250 deg C, Open ID fan damper 10%.
3.     When Flue gas temperature at PCC outlet rises more than       600 deg C., close the ID fan damper and start ID fan.
4.     When Drum pressure reaches 5 Kg/cm2, close the Drum vent and Puppy header vent.
5.     When Boiler Drum pressure reaches 20 Kg/cm2, give blow down of the water wall to remove the deposition or sludge.
6.    By adjusting damper opening raise the Boiler pressure upto 45 kg/cm2 and 485 deg C.
7.    Start-up vent should be in open condition since the admittance of hot flue gas in boiler.
8.   Open the Main steam line drains in between Boiler Main Steam Stop Valve (MSSV) and TG MSSV.
9.  Open the MSSV by pass valve to remove all the condensate in main steam line and ensure that TG MSSV is in close condition.
10.   After removal of all the condensates in Main steam line and proper line heating, open Main Steam stop valve of Boiler.
11.   Close Super heater drains.
12.   Put Drum level controller in Auto mode.
13.   Put Attemperator controller in Auto mode.
14.   Close Start up vent as per the steam demand of TG set.
15. Charge ESP when Flue gas temperature after Economizer reaches 160deg. C

Finally the flue gas passes through Electrostatic Precipitator (ESP) and exhausted to atmosphere through chimney. At ESP the dust particle in the flue gas is trapped and clean gas  escapes to atmosphere.
Ash which is produced in the Boiler due to combustion of solid fuel is collected at Boiler bottom and also in Economizer, Air Pre-heater and ESP. This ash is disposed off with the help of suitable ash handling system.

POWER PLANT OPERATION

POWER PLANT OPERATION

BOILER
Definition
As per Indian Boiler Act 1923, Boiler is defined as any closed vessel exceeding 22.75 liters in capacity which is used exclusively for generating steam under pressure and includes any mounting or accessories attached to such vessel, which is wholly or partially under pressure, when steam is shut off.
A good Boiler should have some essential qualities.
1.     Capable to meet large load fluctuations.
2. Fuel efficient i.e. to generate maximum steam with minimum fuel consumption.
3.     Ability to start-up quickly.
4.     Easy in maintenance and inspection.
5.     Occupy  less floor space.
6.     Lower friction loss in water and flue gas circuit
7.     Little attention for operation and maintenance.

Systems in a Boiler
A Boiler mainly contains following systems :
1.     Feed water system.
2.     Steam system.
3.     Air system.
4.     Flue gas system.
5.     Fuel handling system.
6.     Ash handling system.

Boiler Mountings
Fittings on a Boiler which are required for its safe and efficient operation are called mountings. These are as follows :
1.     Safety valve
2.     Water level sight glass (gauge glass)
3.     Pressure gauge
4.     Blow down valve
5.     Main steam stop valve
6.     Feed water check valve (NRV)
7.     Air Vent
8.     Start-up vent
9.     Manhole

Boiler Accessories
The devices which are used in a Boiler as an integral part and help to run the Boiler efficiently are called  Boiler Accessories.  These are :
1.     Super heater
2.     De-super heater
3.     Economizer
4.     Air Pre-heater
5.     Soot Blower
6.     Feed Pump
7.     ID and FD fans
8.     Ash Removal system
9.     Fuel supply system
10.   Dosing system
11.   Deaerator


Steam Generation In A Boiler..contd
In a Boiler fuel is burnt to get heat energy which is converted from chemical energy stored in a fuel. This heat energy is utilized to produce steam from feed water.

Fuel is fired in the furnace of the Boiler. Different fuel is used in different Boilers. Accordingly furnace is designed. Water tubes are arranged around the furnace and flue gas path. Water tube arrangement made around the furnace is called as water wall. Feed water is circulated in these tubes. Water comes to water wall from Boiler drum, and circulated back to drum after absorbing heat. Due to difference in density which is created due to difference in temperature, water circulates in these tubes naturally. Therefore, it is called Natural Circulation.



During circulation of water in tubes, steam is generated and collected at the upper part of the Drum. This is called Saturated Steam corresponding to Boiler drum pressure. This steam is further heated in Superheaters and becomes superheated steam.

Boiler Drum is filled with fresh feed water. The feed water, before entering into drum is heated at Economizer. Economizer is placed at the flue gas path. Most of the heat of the flue gas is utilized inside the Boiler. Still considerable amount of heat energy is available in it. This heat is utilized in Economizer to heat up the feed water.

For burning of fuel, required Oxygen is obtained from atmospheric air. Air is required in Boiler furnace for combustion. This is supplied by Forced Draught (FD) fan. This air is heated at air pre-heater (APH) before being sent into furnace. If cold air is used then there will be loss in energy. Air pre-heater is placed at the flue gas path after Economizer. Air pre-heater is a heat exchanger which exchanges the heat of flue gas to the cold air, which is to be used in furnace. By heating the air, burning of fuel is easier and loss of energy is minimized. If hot flue gas would not be used to heat up feed water at Economizer and air at Air Pre-heater then it would escape into atmosphere.

Finally the flue gas passes through Electrostatic Precipitator (ESP) and exhausted to atmosphere through chimney. At ESP the dust particle in the flue gas is trapped and clean gas  escapes to atmosphere.

Ash which is produced in the Boiler due to combustion of solid fuel is collected at Boiler bottom and also in Economizer, Air Pre-heater and ESP. This ash is disposed off with the help of suitable ash handling system.

BOILER TECHANICAL TERM

Hydrotest Pressure Vs Design Pressure.

Design pressure is usually the pressure set by process engineer, based on the results of a simulation or similar study. Hydrotest pressure is the actual pressure the vessel is tested at. Usually the hydrotest pressure is 1.3 times the design pressure (ASME requirement).
So if the design pressure is 100 KPa(g), the hydrotest pressure would be 130 KPa(g). Therefore the rule (or requirement) is called 10/13 rule.

Maximum allowable Working pressure (MAWP) Vs Design pressure

 Design pressure is usually the pressure set by process engineer, based on the results of a simulation or similar study. MAWP is the pressure based on the actual characteristics of the vessel/equipment (which is usually manufactured to exceed the specifications set by process engineer). Maximum allowable working pressure is always greater than or equal to design pressure.

Permissive, interlock - Difference

The PERMISSIVES, are some conditions that need to be satisfied before you can start the machine. For e.g. a compressor can be started only when there is sufficient suction pressure.
INTERLOCK: During the process, if a condition fails, interlocks are activated. For e.g. a pump shutdown interlock is activated when the level of drum goes low.
An interlock can also be a permissive, but the converse is not true. For the compressor example (in Permissives), if insufficient suction pressure is a permissive, the compressor will not shutdown, if there is insufficient suction pressure. It is just a condition for the system to start. But if insufficient suction pressure was an interlock, the system will shutdown, when ever the suction pressure goes below a fixed value. But once shutdown, all the permissives need to be satisfied before the system can start again.

Hot bolting

Hot bolting is a method of replacing the bolts on a live line.  Normally done one bolt at a time.  Hot bolting should be used only when there is no other reasonable choice.

The criteria typically followed is something like:
• The operating pressure must be less than 75% of the MAWP as allowed under ANSI B16.5 at the operating temp of the piping or process system to be hot bolted.
• The flange must have a minimum of 8 bolts
• The process temperature must b
e between 4°and 71° C.
• All flanges and associated system equipment must be adequately supported, i.e. no excessive vibration or pulsation.
Monitoring for hydrocarbons is also a must during the operation.  Generally the procedure for hot bolting is the same sequence as for a tightening operation.
• The gasket area must not show signs of leakage. Piping, flanges, and bolts must not be severely corroded, i.e., to the point of affecting their integrity.
• Existing flange bolts/nuts must be tight and of the correct size and grade.

Hot Bolting" Calculations

I am looking for advice regarding the appropriate calculation method to find the maximum operating pressure we can allow when we perform a Hot Bolt procedure (ie, removing one bolt at a time for maintenace purposes).  I can run the calculations using an ASME Section VII calculator (Mr. Pedersen's), but when you reduce the number of bolts by 1, it simply re-distributes the remaining bolts over the diameter.  If I remove half the bolts (to accurately reflect the increased distance between adjacent bolts) to get the correct spacing, the bolt stress for MAWP is too conservative as compared to removing only one bolt (I am looking at my limiting factor being bolt stress from either MAWP or seating perspective- whichever is greater).
I have never heard of anyone taking one bolt at a time for maintenance purposes from a pressurised vessel, sounds extremely dangerous to me.
RossABQ - yes, one bolt at a time...but not necessarily "replacing" - we often just remove one bolt, clean it up, put some sort of lubricant on it (the lubricant issue is a whole other can of worms), and then re-install the bolt/nut.  We do this on flanges associated with piping AND on vessel manways....most often in preparation for turnaround maintenance, but also on the rare occasions when we find a bolt has some corrosion or when when find a "short bolt" (ie, a bolt that is too short and the nut is not fully engaged...usually on facilites we acquired at one time or another) or when we find a nut or bolt that is not the correct grade....in any of these cases we would then replace the bolt and/or nut. desertfox - I don't believe it is "extrememly dangerous" - the industry has been doing this forever.  Most of the larger companies have specific procedures for this operation (I have copies of the BP, ConocoPhillips, and the EEMUA Information sheet for Hot Bolting). Folks, thanx for your interests...and look forward to your thoughts and suggestions for the flange limit calcs.
Hot bolting is fairly common, I've been around it quite a bit before.  It's simply replacing the bolts on a live line.  You do it a bolt at a time.  That being said, hot bolting should be usedo nly when there is no otehr reasonable choice.

The criteria typically followed is something like:
• The operating pressure must be less than 75% of the MAWP as allowed under ANSI B16.5 at the operating temp of the piping or process system to be hot bolted.
• The flange must have a minimum of 8 bolts
• The process temperature must be between 40°and 160° Fahrenheit.
• All flanges and associated system equipment must be adequately supported, i.e. no excessive vibration or pulsation.
Monitoring for hydrocarbosn is also a must during the operation.  Generally the procedure for hot bolting is the same sequence as for a tightening operation.
• The gasket area must not show signs of leakage. Piping, flanges, and bolts must not be severely corroded, i.e., to the point of affecting their integrity.
• Existing flange bolts/nuts must be tight and of the correct size and grade.
In my opinion, the answer to your stud bolt question is.... "it depends"....!!!It depends mostly on the cost and degree of corrosion on the bolt. If the bolt is of large diameter and of expensive materials, it pays to be carefull and reuse it. Smaller, more common materials may be replaced as a mater of policy
We have hot bolted at 1250F @ 250 psig. We routinely hot bolt polymer lines at 600F @ 1500 psig. Our process requires that we completely dismantle a production unit at overhaul. This involves the removal of several thousand studs, mainly B-16 5/8"-@ 1/2" but considerable B8 Cl2 material. Part of these production units are components that use H11 SHCS that are changed out and reused on set schedule of approximately 15 days. Each line has 48 of these components that have 98 SHCS. As we have 17 lines the reuse of studs and bolts is almost a necessity. Tough there is not a formal inspection of the studs they are screened by adding 2 nuts to each stud during a process we call Daging, the addition of a collodial graphite lubricant. We run each stud through a Pyrolysis Furnace to remove any existing Dag and the disassembled studs and nuts are run through the Daging bath, Dag and water.  After Daging the studs and nuts are assembled with a full nut engagement on each end of the stud. I would say less than 1% are rejected during this process. about 90% of the rejected studs are recovered by lite duty mechanics. It is a very rare occurrence when a mechanic has problem with a stud when the piping is reassembled. Some of the studs in use are over 40 years old as witnessed by some Crane Alloy Studs from the 50's that are found in service. At various times I've removed a sample of studs and physically measured the threads and have never seen anything approaching rejection. There is problem sometime with meaning of "hot bolting" being taken as retorquing a bolted connection at operating conditions. "Hot bolting" and "hot torquing" are two separate operations. Care has to be taken with both operations. I've seen sevral problems with "hot torquing" were people forget the proper tightening sequence.

Thursday, April 1, 2021

CALCULATION OF DISCHARGE PIPE INNER DIAMETER FOR COMPRESSED AIR SYSTEM

 Determine the discharge pipe inner diameter size (in mm) for compressed air system, having following parameters.

 Compressed Air Flow at NTP (FAD) = 1000 Nm3/hr

 Discharge Air Pressure = 7 bar(g)

 Discharge Air Temperature = 35 o C

 Air Velocity = 7 m/s.

 Atmospheric Pressure = 1.013 bar


CALCULATION:


Actual Condition                         vs                  NTP Condition

 P2 x V2 / T2                                                  = P1 x V1 / T1

 (1.013 + 7) x V2 / (273 + 35)                       = 1.013 x 1000 / 273

 V1, actual flow rate = 142.6 m3/hr

   = 0.0396 m3/s 

 Flow rate (m3/s) = Area, in mtr2 x Velocity (m/s)

 Area, in mtr2 = Flow rate (m3/s) / Velocity (m/s)

= 0.0396 / 7 = 0.0057 m2

 A = π (di2/4) = 0.0057 m2

 Pipe, in mm = di = 0.085 m = 85 mm 

= say 90 mm

MEASUREMENT OF ENERGY CONSERVATION IN BUILDING

 

Five energy conservation measures for energy use in buildings


1. Weather-stripping of Windows and Doors : Minimize exfiltration of cool air and infiltration of warm air through leaky windows and doors by incorporating effective means of weather stripping

2. Stripping. Self-closing doors should also be provided where heavy traffic of people is anticipated.

3. Temperature and Humidity Setting: Ensure human comfort by setting the temperature to between 23oC and 25oC and the relative humidity between 55% to 65%.

4. Chilled Water Leaving Temperature: Ensure higher chiller energy efficiency by maintaining the chilled water leaving temperature at or above 7o C. As a rule of thumb, the efficiency of a centrifugal chiller increases by about 2¼ % for every 1o C rise in the chilled water leaving temperature.

5. Chilled Water Pipes and Air Ducts: Ensure that the insulation of the chilled water pipes and ducting system is maintained in good condition. This helps to prevent heat gain from the surroundings.

6. Chiller Condenser Tubes: Ensure that mechanical cleaning of the tubes is carried out at least once every six months. Fouling in the condenser tubes in the form of slime and scales reduces the heat transfer of the condenser tubes and thereby reducing the energy efficiency of the chiller.

7. Cooling Towers: Ensure that the cooling towers are clean to allow for maximum heat transfer so that the temperature of the water returning to the condenser is less than or equal to the ambient temperature.

8. Air Handling Unit Fan Speed: Install devices such as frequency converters to vary the fan speed. This will reduce the energy consumption of the fan motor by as much as 15%.

9. Air Filter Condition: Maintain the filter in a clean condition. This will improve the heat transfer between air and chilled water and correspondingly reduce the energy consumption.

FLOW CONTROL METHOD OF INDUSTRIAL FAN

 

Briefly explain any three different methods of flow control for fans


Pulley Change: 

When a fan flow change is required on a permanent basis, and the existing fan can handle the change in capacity, the volume change can be achieved with a speed change. The simplest way to change the speed permanently is with a pulley change. For this, the fan must be driven by a motor through a v-belt system. 

Damper Control: 

Dampers provide a means of changing air volume by adding or removing system resistance. This resistance forces the fan to move up or down along its characteristic curve, generating more or less air without changing fan speed. 

Inlet Guide Vane:

 Guide vanes are curved sections that lay against the inlet of the fan. Guide vanes pre-swirl the air entering the fan housing. This changes the angle at which the air is presented to the fan blades, which, in turn, changes the characteristics of the fan curve. Guide vanes are energy efficient for modest flow reductions – from 100 percent flow to about 80 percent. Below 80 percent flow, energy efficiency drops sharply. 

Variable Speed Drive:

Variable speed operation involves reducing the speed of the fan to meet reduced flow requirements. Fan performance can be predicted at different speeds using the fan laws. Since power input to the fan changes as the cube of the flow, this will usually be the most efficient form of capacity control.

PUMP EFFICIENCY CALCULATION

 PUMP EFFICIENCY CALCULATION

A pump is filling water in to a rectangular overhead tank of 5 m x 4 m with a height of 8 m. The inlet pipe to the tank is located at height of 20 m above ground. The following additional data is collected :

 Pump suction : 3 m below pump level

 Overhead tank overflow line : 7.5 m from the bottom of the tank

 Power drawn by motor : 5.5 kW

 Motor efficiency η : 92%

 Time taken by the pump to fill the

overhead tank upto overflow level : 180 minutes Assess the pump efficiency.



CALCULATION

Volume of the tank = 5 x 4 x 7.5 = 150 m3 Flow

 = 150/3 = 50 m3/hr

Hydraulic power = Q (m3/s) x total head (m) x 1000 x 9.81 /1000

 = (50/3600) x (20 –(-3)) x 1000 x 9.81/1000 

Hydraulic power = 3.13 kW 

 Power input to pump = 5.5 x 0.92 = 5.06 kW 

Pump efficiency = 3.13/5.06 = 61.9% 

STEAM TURBINE STANDARD OPERATING PROCEDURE

Steam Turbine standard operating procedures (SOPs) Lube oil system operation Pre-checks • Ensure lube oil tank level is normal • Ensure l...